DC Fast ChargersAll-in-One

AMPS Charger ICULC-320212 DC Fast Charger Manual

Setup, everyday use, maintenance and troubleshooting for the 320 kW DC fast charger, with verified specifications.

  • Max output320 kW
  • ConnectorsCCS
  • Outputs2
  • Input480 V 3-phase

About the AMPS Charger ICULC-320212

The AMPS Charger ICULC-320212 is a 320 kW DC fast charger certified under the ENERGY STAR program for electric vehicle supply equipment. It offers a maximum available output of 320 kW (up to 300 A), with 2 charging outputs using CCS connectors.

As an all-in-one unit, the power electronics, controls and cables are housed in a single cabinet at the parking space. It is rated for a 480 V three-phase supply.

With no vehicle connected it draws 216.1 W.

Network capability is not listed in the certification data; confirm connectivity options with the manufacturer. Equipment includes a credit card reader, an RFID card reader, a high-resolution display, ISO 15118 power-line communication, a revenue-grade meter, and a camera / occupancy sensor.

Specifications

AMPS Charger ICULC-320212 specifications
BrandAMPS Charger
Model numberICULC-320212
ConfigurationAll-in-One
Maximum available output320 kW
Maximum output current300 A
Charging outputs2
Connector typesCCS
Supply typeAC input
Rated input voltage480 V
Input phaseThree Phase
Output cable length16 ft
Power factor at full load1.00
Standby power, no vehicle connected216.1 W
Idle mode power1,452 W
Network capableNo
Demand-response (connected) capableNo
Credit card readerYes
RFID readerYes
High-resolution displayYes
ISO 15118 (PLC) communicationYes
Revenue-grade meterYes

Safety information

  • DC fast chargers operate at hazardous voltages — a 480 V three-phase supply and a DC output of several hundred volts. Only qualified electrical workers trained by the manufacturer should open the enclosure, and only after lockout/tagout and verification of zero energy, following NFPA 70E or the equivalent workplace electrical-safety rules.
  • Installation must comply with the National Electrical Code (NEC Article 625 and related articles) or the Canadian Electrical Code, the manufacturer's installation manual and local requirements. Permits, inspections and utility approval are required.
  • Know where the emergency stop and upstream disconnects are, keep them unobstructed and clearly labeled, and train site staff to use them.
  • Take an output out of service immediately if its cable jacket is cut, the connector is cracked or pins are damaged, or the holster is broken. Do not attempt field repairs to cables or connectors.
  • Keep cables off the ground and coiled on their holsters or cable-management systems so they are not driven over or become a tripping hazard.
  • Drivers should use only connector adapters approved by their vehicle manufacturer, and never force a connector into a port.

Installation and site planning

A DC fast charger is a site project rather than a simple appliance installation. Plan for utility coordination, electrical design by a licensed engineer or electrical contractor, civil work and commissioning by a manufacturer-certified technician. At 320 kW output on a 480 V three-phase supply, input current at full load is on the order of 405 A (a rough estimate from output power and efficiency) — use the nameplate input rating in the installation manual for conductor and overcurrent sizing, which the NEC requires to be at least 125% of the continuous load.

  1. Engage the utility early

    Request a service evaluation for the added load (320 kW for this unit). Many sites need a new service or transformer, and lead times can be long. Ask about commercial EV rate options and demand charges, which often dominate operating cost.

  2. Design the site

    Lay out stalls so the 16 ft cables reach charge ports on either side of typical vehicles, include accessible stalls and routes as required by accessibility rules, and add bollards or wheel stops, lighting, signage and space for maintenance access around the cabinet.

  3. Prepare foundations and conduit

    Build the concrete pad and conduit runs to the manufacturer's drawings, including anchor-bolt patterns and minimum clearances for cooling airflow.

  4. Set and wire the equipment

    Set the cabinet(s), terminate the supply conductors and grounding to the specified torque, and install any separate communication cabling. Only qualified electricians should perform this work.

  5. Commission

    A manufacturer-certified technician performs start-up checks, verifies insulation and protective functions, updates firmware and runs test sessions with a vehicle or load bank.

  6. Inspect and open

    Pass the electrical inspection, then publish the site to charging-network maps and apps so drivers can find it.

Using your DC fast charger

Driver charging session

  1. Select the correct connector (CCS) — and insert it fully into the vehicle's port.
  2. Authorize the session by tapping or inserting a credit card, tapping an RFID card, or Plug & Charge with compatible vehicles.
  3. The charger and vehicle check the connection and insulation before energizing; charging then ramps up automatically.
  4. Stop the session from the screen, the app or the vehicle, wait for the connector to unlock, and return it to its holster.

What determines charging speed

  • The vehicle requests the power; the charger supplies up to 320 kW, but most cars accept less than that, especially at high states of charge.
  • Charging is fastest at low battery levels and tapers significantly above roughly 80% state of charge, so stopping at 80% frees the stall sooner.
  • Very cold or hot batteries charge more slowly until the vehicle conditions them; preconditioning on the way to the charger helps.
  • With 2 outputs, the 320 kW maximum is the unit's total available power. When more than one vehicle charges at once it may be divided between them; the manual describes the power-sharing scheme.
  • High ambient temperatures or blocked cooling vents can cause the charger to reduce output to protect its components.

Care and maintenance

WhenWhat to do
Daily or weeklyWalk the site: check connectors, holsters and cables for damage, clear debris and confirm screens and status lights are working.
Every monthClean connector faces and holsters with a dry or lightly damp cloth (never a pressure washer), clean the display and card reader, and test a charging session on each output.
Every 3–6 monthsInspect and clean or replace air filters and check that cooling intakes and exhausts are clear, as the manual specifies. Check enclosure door seals and cable-management hardware.
Every yearQualified technicians perform preventive maintenance per the manufacturer's schedule — typically power-connection torque checks, thermal imaging, cooling-system service, protective-function tests and firmware updates.
After any vehicle impactTake the unit out of service and have it inspected, even if damage looks cosmetic.

Keep a maintenance log and track uptime by output. Many manufacturers and network operators offer service agreements that include remote diagnostics and guaranteed response times.

Troubleshooting

Many fast-charging problems originate on the vehicle side or in communications. Check the basics below, then escalate to the service provider with the fault code and time of the event.

ProblemPossible causeWhat to try
Session will not startAuthorization failed; charger offline from its network; connector not fully seated.Retry authorization or use another method; check network status; reseat the connector and wait for the handshake to complete.
Charging slower than expectedVehicle's own limit or high state of charge; cold battery; power shared with another output; thermal derating.Compare with the vehicle's charging curve; check whether another vehicle is charging; inspect cooling vents and filters.
Session stops unexpectedlyInsulation or ground-fault check failed; communication error between vehicle and charger; vehicle requested stop.Restart the session once. If the same fault repeats, record the fault code and take the output out of service for inspection.
Payment or card reader not workingTerminal offline; reader dirty or damaged.Check the terminal's network link; clean the reader; offer an app or RFID alternative while it is repaired.
Charger shows offlineCellular, Wi-Fi or Ethernet connection lost; backend outage.Check the modem or router and signal strength; contact the network operator. Some chargers continue local operation while offline.
Display dark or unreadableDisplay or control power fault; very high ambient light.Check status through the network platform; contact service if the display has failed.
Connector hot or damagedWear, contamination or mechanical damage.Take the output out of service immediately and have the cable assembly replaced by a qualified technician.
Fault code displayedBrand-specific diagnostic code.Fault codes are not standardized; consult the code table in your manufacturer's manual or service portal.

Energy use and running costs

With no vehicle connected the AMPS Charger ICULC-320212 draws 216.1 W. If it sat in that state around the clock, it would use about 1,893 kWh a year — roughly $322 at $0.17 per kWh. Commercial electricity prices vary widely, so substitute your own rate.

For most commercial sites, utility demand charges — billed on the highest power drawn in a billing period — can outweigh energy charges. Power-management settings, staggered sessions and on-site storage can reduce peak demand.

Frequently asked questions

How powerful is the AMPS Charger ICULC-320212?

Its maximum available output is 320 kW, with up to 300 A of output current. The actual charging rate depends on what each vehicle can accept and its battery's state of charge.

What connectors does the AMPS Charger ICULC-320212 have?

The certification lists CCS connectors across its 2 outputs.

Can the AMPS Charger ICULC-320212 charge two vehicles at once?

It has 2 outputs. The 320 kW figure is the unit's total available power, which may be shared when several vehicles charge simultaneously; check the manual for how power is allocated.

What electrical service does the AMPS Charger ICULC-320212 need?

It is rated for a 480 V three-phase supply. A rough estimate of full-load input current is 405 A; the nameplate rating and the installation manual govern circuit sizing, which must be at least 125% of the continuous load. Utility coordination is usually required.

Does the AMPS Charger ICULC-320212 accept credit cards and connect to a network?

Network capability is not listed in its certification data, so confirm connectivity options with the manufacturer. A credit card reader is listed among its features.

How long are the charging cables on the AMPS Charger ICULC-320212?

The certification lists an output cable length of 16 ft. Lay out stalls so the cable reaches charge ports on either side of typical vehicles.

How much power does the AMPS Charger ICULC-320212 use on standby?

It draws 216.1 W with no vehicle connected — about $322 a year at $0.17/kWh if left in standby continuously.

Sources and disclaimer

Specifications on this page come from the ENERGY STAR certified dc fast chargers dataset published by the U.S. Environmental Protection Agency (record certified September 25, 2025), retrieved October 7, 2026.

The setup, operating, maintenance and troubleshooting guidance is written by ManualHarbor's editors for this specific product type and configuration. It is an independent guide — not a reproduction of the manufacturer's manual — and ManualHarbor is not affiliated with AMPS Charger. Always follow the safety instructions, installation requirements and warranty terms supplied with your unit, and contact AMPS Charger or an authorized service provider for warranty repairs and replacement parts.

Running-cost figures use assumed U.S. average utility prices and are estimates for comparison only. See our editorial methodology for details.