DC Fast ChargersDistributed
Loop Global EVS-FLASH-300-D01 DC Fast Charger Manual
Setup, everyday use, maintenance and troubleshooting for the 300 kW distributed (split-system) DC fast charger, with verified specifications.
- Max output300 kW
- ConnectorsCCS + NACS
- Outputs2
About the Loop Global EVS-FLASH-300-D01
This guide covers the Loop Global EVS-FLASH-300-D01, a 300 kW distributed (split-system) DC fast charger listed as ENERGY STAR certified. It offers a maximum available output of 300 kW, with 2 charging outputs using CCS and NACS (SAE J3400) connectors.
As a distributed (split) system, the power conversion equipment sits in a separate cabinet that feeds one or more dispensers at the parking spaces, which keeps the dispensers compact and lets one cabinet serve several stalls.
It is network capable over Ethernet, Wi-Fi, or cellular.
Specifications
| Brand | Loop Global |
|---|---|
| Model number | EVS-FLASH-300-D01 |
| Model name / series | Infinity Flash Dispenser |
| Configuration | Distributed |
| Maximum available output | 300 kW |
| Charging outputs | 2 |
| Connector types | CCS, NACS (SAE J3400) |
| Supply type | AC input |
| Input phase | Three Phase |
| Output cable length | 6 ft |
| Network capable | Yes |
| Network connection | Ethernet, Wi-Fi, cellular |
| Demand-response (connected) capable | Yes |
| Credit card reader | No |
| RFID reader | No |
| High-resolution display | No |
| ISO 15118 (PLC) communication | No |
| Revenue-grade meter | No |
Safety information
- DC fast chargers operate at hazardous voltages — a three-phase supply and a DC output of several hundred volts. Only qualified electrical workers trained by the manufacturer should open the enclosure, and only after lockout/tagout and verification of zero energy, following NFPA 70E or the equivalent workplace electrical-safety rules.
- Installation must comply with the National Electrical Code (NEC Article 625 and related articles) or the Canadian Electrical Code, the manufacturer's installation manual and local requirements. Permits, inspections and utility approval are required.
- Know where the emergency stop and upstream disconnects are, keep them unobstructed and clearly labeled, and train site staff to use them.
- Take an output out of service immediately if its cable jacket is cut, the connector is cracked or pins are damaged, or the holster is broken. Do not attempt field repairs to cables or connectors.
- Keep cables off the ground and coiled on their holsters or cable-management systems so they are not driven over or become a tripping hazard.
- Drivers should use only connector adapters approved by their vehicle manufacturer, and never force a connector into a port.
Installation and site planning
A DC fast charger is a site project rather than a simple appliance installation. Plan for utility coordination, electrical design by a licensed engineer or electrical contractor, civil work and commissioning by a manufacturer-certified technician.
- Engage the utility early
Request a service evaluation for the added load (300 kW for this unit). Many sites need a new service or transformer, and lead times can be long. Ask about commercial EV rate options and demand charges, which often dominate operating cost.
- Design the site
Lay out stalls so the 6 ft cables reach charge ports on either side of typical vehicles, include accessible stalls and routes as required by accessibility rules, and add bollards or wheel stops, lighting, signage and space for maintenance access around the cabinet.
- Prepare foundations and conduit
Build the concrete pad and conduit runs to the manufacturer's drawings, including anchor-bolt patterns and minimum clearances for cooling airflow. For this distributed system, respect the maximum cable distance between the power cabinet and each dispenser stated in the manual.
- Set and wire the equipment
Set the cabinet(s), terminate the supply conductors and grounding to the specified torque, and install any separate communication cabling. Only qualified electricians should perform this work.
- Commission
A manufacturer-certified technician performs start-up checks, verifies insulation and protective functions, updates firmware and runs test sessions with a vehicle or load bank.
- Activate network and payment
Connect the charger to its network (Ethernet, Wi-Fi, or cellular), then configure pricing, access control.
- Inspect and open
Pass the electrical inspection, then publish the site to charging-network maps and apps so drivers can find it.
Using your DC fast charger
Driver charging session
- Select the correct connector — this unit offers CCS and NACS (SAE J3400) — and insert it fully into the vehicle's port.
- Authorize the session by starting the session in the network app.
- The charger and vehicle check the connection and insulation before energizing; charging then ramps up automatically.
- Stop the session from the screen, the app or the vehicle, wait for the connector to unlock, and return it to its holster.
What determines charging speed
- The vehicle requests the power; the charger supplies up to 300 kW, but most cars accept less than that, especially at high states of charge.
- Charging is fastest at low battery levels and tapers significantly above roughly 80% state of charge, so stopping at 80% frees the stall sooner.
- Very cold or hot batteries charge more slowly until the vehicle conditions them; preconditioning on the way to the charger helps.
- With 2 outputs, the 300 kW maximum is the unit's total available power. When more than one vehicle charges at once it may be divided between them; the manual describes the power-sharing scheme.
- High ambient temperatures or blocked cooling vents can cause the charger to reduce output to protect its components.
Remote monitoring
Use the network platform to watch charger status, session data and fault alerts, and to take part in utility demand-response programs (the model is listed as demand-response capable). Set up alert notifications so faults are seen and dispatched quickly — uptime is the most important performance measure for a public fast charger.
Care and maintenance
| When | What to do |
|---|---|
| Daily or weekly | Walk the site: check connectors, holsters and cables for damage, clear debris and confirm screens and status lights are working. |
| Every month | Clean connector faces and holsters with a dry or lightly damp cloth (never a pressure washer), clean the display, and test a charging session on each output. |
| Every 3–6 months | Inspect and clean or replace air filters and check that cooling intakes and exhausts are clear, as the manual specifies. Check enclosure door seals and cable-management hardware. |
| Every year | Qualified technicians perform preventive maintenance per the manufacturer's schedule — typically power-connection torque checks, thermal imaging, cooling-system service, protective-function tests and firmware updates. |
| After any vehicle impact | Take the unit out of service and have it inspected, even if damage looks cosmetic. |
Keep a maintenance log and track uptime by output. Many manufacturers and network operators offer service agreements that include remote diagnostics and guaranteed response times.
Troubleshooting
Many fast-charging problems originate on the vehicle side or in communications. Check the basics below, then escalate to the service provider with the fault code and time of the event.
| Problem | Possible cause | What to try |
|---|---|---|
| Session will not start | Authorization failed; charger offline from its network; connector not fully seated. | Retry authorization or use another method; check network status; reseat the connector and wait for the handshake to complete. |
| Charging slower than expected | Vehicle's own limit or high state of charge; cold battery; power shared with another output; thermal derating. | Compare with the vehicle's charging curve; check whether another vehicle is charging; inspect cooling vents and filters. |
| Session stops unexpectedly | Insulation or ground-fault check failed; communication error between vehicle and charger; vehicle requested stop. | Restart the session once. If the same fault repeats, record the fault code and take the output out of service for inspection. |
| Payment or card reader not working | Terminal offline; reader dirty or damaged. | Check the terminal's network link; clean the reader; offer an app or RFID alternative while it is repaired. |
| Charger shows offline | Cellular, Wi-Fi or Ethernet connection lost; backend outage. | Check the modem or router and signal strength; contact the network operator. Some chargers continue local operation while offline. |
| Display dark or unreadable | Display or control power fault; very high ambient light. | Check status through the network platform; contact service if the display has failed. |
| Connector hot or damaged | Wear, contamination or mechanical damage. | Take the output out of service immediately and have the cable assembly replaced by a qualified technician. |
| Fault code displayed | Brand-specific diagnostic code. | Fault codes are not standardized; consult the code table in your manufacturer's manual or service portal. |
Frequently asked questions
How powerful is the Loop Global EVS-FLASH-300-D01?
Its maximum available output is 300 kW. The actual charging rate depends on what each vehicle can accept and its battery's state of charge.
What connectors does the Loop Global EVS-FLASH-300-D01 have?
The certification lists CCS and NACS (SAE J3400) connectors across its 2 outputs. NACS (SAE J3400) is the connector originally developed by Tesla and now being adopted across North America.
Can the Loop Global EVS-FLASH-300-D01 charge two vehicles at once?
It has 2 outputs. The 300 kW figure is the unit's total available power, which may be shared when several vehicles charge simultaneously; check the manual for how power is allocated.
Does the Loop Global EVS-FLASH-300-D01 accept credit cards and connect to a network?
It is network capable (Ethernet, Wi-Fi, or cellular). A credit card reader is not listed in the certification data.
What power supply does the Loop Global EVS-FLASH-300-D01 use?
It is listed for AC input (three phase). The rated input voltage is not given in the certification data, so take it from the nameplate and installation manual.
How long are the charging cables on the Loop Global EVS-FLASH-300-D01?
The certification lists an output cable length of 6 ft. Lay out stalls so the cable reaches charge ports on either side of typical vehicles.
Is the Loop Global EVS-FLASH-300-D01 ENERGY STAR certified?
Yes. It appears on the ENERGY STAR list of certified DC-output electric vehicle supply equipment, with a certification date of April 2025.
Sources and disclaimer
Specifications on this page come from the ENERGY STAR certified dc fast chargers dataset published by the U.S. Environmental Protection Agency (record certified April 1, 2025), retrieved October 7, 2026.
The setup, operating, maintenance and troubleshooting guidance is written by ManualHarbor's editors for this specific product type and configuration. It is an independent guide — not a reproduction of the manufacturer's manual — and ManualHarbor is not affiliated with Loop Global. Always follow the safety instructions, installation requirements and warranty terms supplied with your unit, and contact Loop Global or an authorized service provider for warranty repairs and replacement parts.
Running-cost figures use assumed U.S. average utility prices and are estimates for comparison only. See our editorial methodology for details.